Service Manual

Reelmaster 3100--D
DPA Cutting Units
Page 8 -- 33
3. The cutting unit has O--rings in the reel bearing bore
of each side plate. Make sure the O--rings are in good
condition and properly installed in the side plates.
4. Apply a thin coat of antiseize lubricant to the reel
bearing bore of each side plate (Fig. 41).
CAUTION
Contact with the reel, bedknife or other cutting
unit parts can result in personal injury. Use
heavy gloves when installing the cutting reel.
5. Make sure that flat wire spring (item 14 in Fig. 38) is
installed into LH side plate.
6. Carefully slide the RH end o f the cutting reel as-
sembly (no groove in reel shaft or on face of threaded
insert) into the RH side plate. Make sure that bearing is
fully seated into side plate.
7. Slide the LH side plate onto the cutting reel as-
sembly.
8. Install shoulder bolts and flange nuts that secure the
LH side plate to the cutting unit frame. Torque the shoul-
der bolts from 27 to 33 ft -lbs (37 to 44 N--m).
9. Apply Loctite #243 (or equivalent) to threads of
flange head screw that secures support rod to LH side
plate. Install screw and torque from 27 to 33 ft-lbs (37
to 44 N--m).
10.Install cap screw and flat washer that secure rear
grass shield to LH side plate. Torque screw from 15 to
19 ft-lbs (20 to 25 N--m).
11. Install the bedbar assembly (see Bedbar Installation
in this section).
12.Install front and rear rollers (see Front Roller Installa-
tion and Rear Roller Installation in this section).
13.Adjust cutting unit (see Cutting Unit Operator’s
Manual).
NOTE: The parallel position of the rear roller to the cut-
ting reel is controlled by the precision machined frame
and side plates of the cutting unit. If necessary, the cut-
ting unit side plates can be loosened and a slight adjust-
ment can be made to parallel the rear roller with the
cutting reel ( see Leveling Rear Roller in this Chapter).
14.Install accessories if equipped. See Chapter 9 -- Uni-
versal Groomer in this manual for additional Groomer in-
formation. See Rear Roller Brush in this chapter for
information on rear roller brush.
1. Spline insert (LH)
2. Reel shaft
3. Reel support plate
4. Pry bar
Figure 42
2
4
3
(85to95ft---- l b )
115 to 128 Nm
1
15.Tighten the spline inserts:
A. Insert a long--handled pry b ar (3/8 x 12 inch with
a screwdriver handle recommended) through the
front of the cutting unit. The pry bar should pass
between the top of the reel shaft and the backs of
the reel blades so that the reel will not move.
IMPORTANT: To avoid grinding the reel, do not con-
tact the cutting edge of any blade with the pry bar as
this may damage the cutting edge and/or cause a
high blade.
B. Move the pry bar against the weld side of the reel
support plate closest to the spline insert being
tightened.
IMPORTANT: The spline insert on the left end of the
cutting reel has left hand threads and the spline in-
sert on the right end of the cutting reel has right
hand threads.
C. Rest the handle of the pry bar against the front
roller and tighten the spline insert closest to the pry
bar. The spline inserts are installed with thread lock-
ing compound (Loctite #243 o r equivalent). Tighten
the spline insert from 85 to 95 ft--lb (115 to128
N--m). Use correct spline insert tool (see Special
Too l s) .
D. Positiontheprybarinthesamemanneronthe
opposite end of the reel and tighten the remaining
spline insert.
16.If counterweight was removed from cutting unit,
install new O --ring on counter weight. Secure counter
weight to cutting unit side plate with two (2) flange nuts.
Tor q ue sc r ew s fr om 27 to 33 ft-lbs (37 to 44 N--m).
17.Install cutting unit to the machine.
DPA Cutting
Units