Installation Sheet

General Instructions
Nozzle Installation:
Note: Nozzles should be installed
first.
If installing Rigid Gooseneck
1. Apply teflon tape or pipe joint
compound to threaded end of no.9.
2. Tighten no.9 firmly by hand into
no.1.
If installing Swing Nozzle
3. Insert no.11 or no.12 into no.1 and
rotate to front of sink.
4. Tighten no.11 firmly with a wrench.
Faucet Installation:
6. Shut off water supply and drain
lines. Drill (2) two holes, approxi-
mately 1-1/4” diameter in countertop
with 8” centers, where you are
installing no.1.
7. Apply teflon tape or pipe joint
compound to water supply lines.
8. Connect no.1 to water supply lines
by screwing no.2 (with eccentric
centers) onto nipple (supplied by
others) and tightening no.2 against
countertop. (Nut under countertop
to be supplied by others). Trim
supply lines if necessary.
9. Turn on water supply and check
for leaks.
water supply line
countertop
nut
9
1
For swivel repair or replacement of
(‘o’-ring) no.17 and (sleeves) no.16.
5. Insert one no.16 onto no.13. Install
no.17 on no.13 and lubricate liberally
with provided no.19. Install second
no.16 onto no.13. (See enlarged view)
12
11
13, 14,
16, 17
18
13
16
17
Enlarged view
(supplied by others)
8”[20 cm]
2
1