/22Manual User | UserFGS Manual | 201811 FGS | 201811 Table of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
201811 | User Manual FGS | 1/22 Introduction This is the original installation, inspection and operating instructions document for FGS air transfer grille.
2/22 | User Manual FGS | 201811 Warnings Some grille parts may have sharp edges – therefore to protect yourself from harm, please use gloves during installation and manipulation. In order to prevent electric shock, fire or any other damage which could result from incorrect damper usage and operation, it is important to: 1. ensure that installation is performed by a trained person. 2. follow the written and depicted instructions provided within this User Manual closely. 3.
201811 | User Manual FGS | 3/22 Installation Methods for the Air Transfer Grille FGS Tab. 1: Permitted installation methods for the air transfer grille FGS Fire Resistivity, Radiation Wall Construction /Thickness Rigid /100 mm Installation Height (H), Ground to FGS bottom edge -0,2 m ... 0,5 m Rigid /100 mm Flexible /125 mm 0,5 m ... 2,8 m Rigid /100 mm Flexible /125 mm 2,8 m ...
4/22 | User Manual FGS | 201811 Opening Preparation for the Rigid Wall H1 = H + 140 (± 30) Walls L 1 = L+ 27 0 (± 30 ) 1 Fig. 1: Rigid wall with a rectangular opening NOTE: L × H = nominal dimensions of the FGS Legend 1 Concrete/masonry/cellular concrete Tab.
201811 | User Manual FGS | 5/22 Opening Preparation for the Flexible Wall max. 62 5 4 Walls 2 H1 = H + 140 (± 30) 3 L 1 =L +2 70 (± 3 0) 1 Fig. 2: Flexible (plasterboard) wall with a rectangular opening NOTE: L × H = nominal dimensions of the FGS S Legend 1 2 2 layers of plasterboard fireproof plate type F, EN 520 (thickness see Tab. 3) Vertical CW - profiles (profile width sCW based on fire resistivity, see Tab.
6/XX |6/22 User |Manual User Manual FGS | FGS 2018XX | 201811 Wet Wet Installation Using Plaster/Mortar/Concrete Filling 1. The supporting construction opening must be prepared in a way described in the section “Opening Preparation” with the dimensions of L1 and H1 (as per Fig. 1 or Fig. 2). Opening surfaces must be even and cleaned off. The flexible wall opening must be reinforced as per the standards for plasterboard walls. 2.
2018112018XX | User Manual | User Manual FGS | FFS 7/22 | 7/XX Wet 5 3 4 2 1 6 Fig. 3: Wet installation of the FGS frame in a rigid or flexible wall using a mixture of plaster or mortar or concrete Legend 1 FGS frame (included in the package) 2 Plaster/mortar/concrete filling 3 Screw, e.g. 5 × 100 (fabory 29385.050.100) 4 Screw, e.g. DIN 7982 C-H 4.2 × 13 5 Flange of the frame that must be aligned with the wall surface 6 Screw DIN 7504M-SR 4.
8/XX |8/22 User |Manual User Manual FGS | FGS 2018XX | 201811 Soft Installation into a Soft Crossing 1. The supporting construction opening must be prepared in a way described in the section “Opening Preparation” with the dimensions of L1 and H1 (as per Fig. 1 or Fig. 2). Opening surfaces must be even and cleaned off. The flexible wall opening must be reinforced as per the standards for plasterboard walls. 2. Prepare mineral wool installation segments thickness 50 mm (2). 3.
2018112018XX | User Manual | User Manual FGS | FFS 9/22| 9/XX Soft 3 4 10 0 2 6 1 5 7 Fig. 4: Installation of the FGS frame into a soft crossing in a rigid or flexible wall Legend 1 FGS frame (included in the package) 2 Mineral wool segment (150 kg/m3, Isover FireProtect® 150, TECH Slab HT 6.2) 3 Screw 5 × 100 (e.g. fabory 29385.050.100) 4 Layer of fire-resistant mastic at least 2 mm thick (Isover Protect BSF) 5 Screw 4.2 × 13 – e.g.
10/22 | User Manual FGS | 201811 Electrical Connections IMPORTANT: Danger of electric shock! Switch off the power supply before working on any electrical equipment. Only qualified electricians are allowed to work on the electrical system. Tab.
201811 | User Manual FGS | 11/22 Legend (Fig. 5 up to Fig.
12/22 | User Manual FGS | 201811 PE N 1 AC 230 V, open - closed L1 3 4 2 1 2 5 6 7 8 9 S1 S2 S3 S4 S5 S6 <5°∢ Tf1 <80°∢ Tf2 Tf3 LED BAE72B-S Fig. 7: DV7-T connection scheme; actuator Belimo BLF230-T and BFN230-T NOTES: • Caution! Main power supply voltage! • A device that disconnects the pole conductors (minimum contact gap 3 mm) is required for isolation from the power supply. • Paralell connection of several actuators possible.
201811 | User Manual FGS | 13/22 AC 230 V 1) 2) 3) a b BF274..-ST BFL24..-ST BFN24..-ST BAE72-S Fig. 9: DV9-T-ST connection scheme; actuator Belimo BLF24-T and BFN24-T through supply and communication unit BKN230-24 NOTES: 1) Jumper factory-fitted. Can be removed if necessary to be replaced by a thermoalectric trip (the safety function will be triggered if terminals 1 and 2 are not linked). 2) Jumper only used for commissioning purposes and without BKS24-.. ! 3) 2-wire conductor to BKS24-..
14/22 | User Manual FGS | 201811 Operation Manual After installation, the functionality of the FGS must be checked and set into the open operating position. Manually operated FGS Twist the blades into the horizontal position (in the direction indicated by the arrow - Fig. 11), force against the spring and fix the first blade with the help of a bend hard wire or a bend wrench from the top side with the thermal fusible link (Fig. 12).
201811 | User Manual FGS | 15/22 Fig. 11: Twist the blades into the horizontal position Fig.
16/22 | User Manual FGS | 201811 Fig.
201811 | User Manual FGS | 17/22 FGS Functionality Check Manually Operated FGS 1. In the open position, all blades must be fully open. If fitted with end position switches the appropriate signalling circuit must switch on. 2. Close the FGS: -- Lever up the upper blade with your fingers and release the thermal fusible link by pushing with a screwdriver in the direction indicated by the arrow (Fig. 13). Remove the screwdriver and release your fingers from the blade.
18/22 | User Manual FGS | 201811 FGS Inspection The FGS manual or actuator mechanism keeps the dampers on stand-by during their entire life cycle in accordance with this manual issued by the manufacturer. It is not permitted to alter the FGS in any way nor perform any changes to its structure without the manufacturer’s consent. The operator performs regular checks of the FGS as per country established regulations, standards or at least once every 12 months.
201811 | User Manual FGS | 19/22 Warranty Conditions For the warranty conditions, please contact our Systemair colleagues in your respective country.
20/22 | User Manual FGS | 201811 Operating Journal Activation of the FGS Air Transfer Grille Mark the Applied Installation Method with a Cross: Date Wet Description of the Discovered Defects and the Date of the Following Inspection after the Elimination of Deficiencies.
201811 | User Manual FGS | 21/22 Periodic Inspections of the FGS Air Transfer Grille - at Least Once Every 12 Months Date Description of the Discovered Defects and the Date of the Following Inspection after the Elimination of Deficiencies.
User Manual 22/22 | User FGS Manual | 201811 FGS | 201811 FGS Air Transfer Grille Identification Slovak Technical approval Nr: SK01-ZSV-0364 Notiffied Body No.
2018XX 201811| User | User Manual Manual FFSFGS | 23/XX
User Manual FGS | 201811
2018XX 201811| User | User Manual Manual FFSFGS | 25/XX
www.systemair.