SYSTEMP – Installation Operation Manual (IOM SYSTEMP rev.N)
Table Of Contents
- WARRANTY CONDITIONS
- 1 DESCRIPTION OF UNITS AND OPERATING LIMITS
- 2 TRANSPORTATION, POSITIONING AND INSTALLATION PROCEDURES
- 3 PLENUMS, VENTILATED PLENUMS AND DUCT SECTIONS (ACCESSORY)
- 4 FREE COOLING PLENUM (ACCESSORY)
- 5 ADJUSTABLE AND VENTILATED PLINTHS (ACCESSORY)
- 6 TMC AIR-COOLED CONDENSER PLACEMENT AND INSTALLATION
- 7 CONNECTION OF CONDENSATE DISCHARGE AND HUMIDIFIER
- 8 WATER CIRCUIT CONNECTIONS
- 9 COOLING CONNECTIONS
- 9.1 ROUTING OF THE COOLING CIRCUIT PIPES
- 9.2 COOLING CIRCUIT SIZING
- 9.3 COOLING CIRCUIT INSTALLATION
- 9.4 UNIT COOLING PIPE CONNECTION
- 9.5 AIR-COOLED CONDENSER CONNECTION
- 9.6 COOLING CIRCUIT VACUUM DRYING OPERATIONS
- 9.7 CHARGING THE COOLING CIRCUIT
- 9.8 PRECAUTIONS
- 9.9 LUBRICATING OIL FILLING IN THE CIRCUIT
- 9.10 TMC CONDENSER PRESSURE REGULATOR (ACCESSORY)
- 9.11 CHECKING THE REFRIGERANT LOAD AND COOLING CIRCUIT OPERATION
- 9.12 PRECAUTIONS AGAINST REFRIGERANT LEAKS
- 9.13 CHECKING THE MAXIMUM CONCENTRATION OF REFRIGERANT
- 10 EXAMPLES OF WATER AND COOLING CIRCUITS
- 10.1 EXAMPLE OF CHILLED WATER CIRCUIT
- 10.2 TMC AIR-COOLED CONDENSER COOLING CIRCUIT
- 10.3 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.4 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.5 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.6 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.7 TWO SOURCES WATER CIRCUIT WITH CHILLED WATER CIRCUITS
- 10.8 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.9 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.10 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.11 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.12 COOLING CIRCUIT WITH FREE COOLING AND SINGLE COMPRESSOR
- 10.13 COOLING CIRCUIT WITH FREE COOLING AND DOUBLE COMPRESSOR
- 11 ELECTRICAL CONNECTIONS
- 11.1 RS485 SERIAL COMMUNICATION BOARD CONNECTION (Modbus RTU - BACnet MS/TP)
- 11.2 ETHERNET RJ45 PORT CONNECTION (Modbus TCP - BACnet IP - Web Server)
- 11.3 CANbus LAN CONNECTION (ACCESSORY)
- 11.4 REMOTE CONTROL TERMINAL CONNECTION (ACCESSORY)
- 11.5 WALL-MOUNTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.6 DUCTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.7 CONNECTION OF THE SMOKE AND FLAME DETECTORS SUPPLIED (ACCESSORY)
- 11.8 WATER DETECTION PROBE CONNECTION (ACCESSORY)
- 11.9 CONNECTION OF FREE COOLING PLENUM MOTORISED DAMPER ACTUATORS (ACCESSORY)
- 11.10 AIR-COOLED CONDENSER POWER SUPPLY AND REGULATION CONNECTION (ACCESSORY)
- 12 ROUTINE AND SPECIAL MAINTENANCE
- 13 DEACTIVATION, DISMANTLING AND DISPOSAL
- 14 APPENDIX 1: RECOMMENDED EQUIPMENT
- 15 APPENDIX 2: PRELIMINARY CHECKS AND FIRST START-UP
- 16 APPENDIX 3: FAULT DIAGNOSIS
- 17 NOTES
35
5.4 INSTALLATION OF ADJUSTABLE AND VENTILATED PLINTHS ON FINISHED FLOOR SURFACE
ATTENTION! DANGER! DANGEROUS HANDLING!
Placing the unit on the plinth before xing the feet to the slab and positioning the raised
oor can cause damage to the supporting feet and a risk of the units falling!
The plinths are installed in the nished oor surface as follows:
1) Place the plinth on the slab. With adjusted plinths, attach the feet to the slab with suitable plugs.
2) Adjust the feet to ensure that the plinth is ush with the upper edge of the nished oor surface and perfectly level.
3) Place a seal on the plinth proles.
4) Position the unit on the plinth, making sure that the aluminium sections are properly aligned with each other.
Example of installation with plinth