L BAL E263

"Separate the materials by type and in an environmentally
friendly way.
"If necessary, commission a specialist company with the waste
disposal.
4 Mounting
Before installation remove the device from the packing and
check for any possible shipping damage!
Assemble the device on a clean and stable base. Do not distort
during assembly! Use the appropriate mounting devices for
proper installation of the unit!
Use the templates printed on the device packing to mark the
fastening bore holes.
The pressure measuring depends on position, therefore the
mounting must be made vertical and as possible on a vibration-
free place (cable inlet and pressure connections down).
The pressure line´s connection should be with plastic-hose (in
building), inside diameter 4 / 5 mm. For a rm hold of the hose,
its inside diameter must be 1 mm smaller than the outside
diameter of the hose nozzle (step spigot 5 / 6 mm).
Remove the connection cover for mounting, electrical connec-
tion and setting of the measuring range. Close the lid again
carefully before start-up (tightening torque of the lid screws
1.1 Nm).
Vertical mounting
Gehäuse
housing
111 mm
Gehäuse / housing
106 mm
11 mm
83 mm
91 mm
Schraube
max 4,5 mm
screw max
4,5 mm
Bohrschablone
drilling template
Drilling template on packing
Operating Instructions PCA1000/6000D2 Mounting
L-BAL-E263-GB 1551 Index 001 Part.-No. 00163445-42
7/20