L BAL E263
Table Of Contents
"Separate the materials by type and in an environmentally
friendly way.
"If necessary, commission a specialist company with the waste
disposal.
4 Mounting
•
Before installation remove the device from the packing and
check for any possible shipping damage!
•
Assemble the device on a clean and stable base. Do not distort
during assembly! Use the appropriate mounting devices for
proper installation of the unit!
•
Use the templates printed on the device packing to mark the
fastening bore holes.
•
The pressure measuring depends on position, therefore the
mounting must be made vertical and as possible on a vibration-
free place (cable inlet and pressure connections down).
•
The pressure line´s connection should be with plastic-hose (in
building), inside diameter 4 / 5 mm. For a firm hold of the hose,
its inside diameter must be 1 mm smaller than the outside
diameter of the hose nozzle (step spigot 5 / 6 mm).
•
Remove the connection cover for mounting, electrical connec-
tion and setting of the measuring range. Close the lid again
carefully before start-up (tightening torque of the lid screws
1.1 Nm).
Vertical mounting
Gehäuse
housing
111 mm
Gehäuse / housing
106 mm
11 mm
83 mm
91 mm
Schraube
max 4,5 mm
screw max
4,5 mm
Bohrschablone
drilling template
Drilling template on packing
Operating Instructions PCA1000/6000D2 Mounting
L-BAL-E263-GB 1551 Index 001 Part.-No. 00163445-42
7/20