Shower Base INSTALLATION INSTRUCTIONS Swiss Madison @SwissMadison #WellMadeForever www.swissmadison.com | 1-434-623-4766 | info@swissmadison.
SHOWER BASE INSTALLATION INSTRUCTIONS PRIOR TO INSTALLATION: · Inspect shower base to ensure no damages have occurred while in shipping. · Observe all plumbing and building codes in accordance with your state and local requirements. · All dimensions are nominal! Be sure to measure your shower base prior to installation. · The step-by-step guidelines in the installation instructions are a general reference. Should there be any discrepancies, Swiss Madison cannot be held liable.
SHOWER BASE INSTALLATION INSTRUCTIONS 1. Rough-In · Rough plumbing must be pre-installed by a licensed plumber before shower base installation. · If floor drain-hole installation is needed, contact a licensed plumber. · Dimensions given during roughing-in are crucial for a proper installation. Wall studs L Rough-In W W 10” 10” x 10” Floor cut-out 10” Studs must be flush and square Stud opening tolerance is +1/4” and -1 L 2.
SHOWER BASE INSTALLATION INSTRUCTIONS 3. Pre-Attach Drain · Do not discard cardboard ring. · Remove shower base from dry fit. · Thread silicone or plumbers putty under drain lip, so when inserted excess sealant will squeeze out from between drain and shower base floor creating an air tight seal. · Flip shower pan upside down: Add rubber ring then cardboard ring and lastly screw on the plastic ring.
Swiss Madison ® ONE YEAR LIMITED WARRANTY 1-434-MADISON (623-4766) 19 Stults Road Dayton, NJ 08810 www.swissmadison.com Swiss Madison® products are made with quality materials and excellent craftsmanship to provide our customers with beautiful, durable, long-lasting products.