Installation Guide

Installation Tips
Measure the actual shower floor before building or
modifying the stud wall framework. The recommended
framework opening measurements are 3/8” wider and
at least 3/16” deeper than the actual size of the shower
floor.
Turn off the hot and cold water supply during
construction.
Never install our products directly on any surface that
is or may become, wet or damp.
Ensure all plumbing or electrical work inside the walls
or subfloor is finished prior to installation of the
shower floor and wall panels.
Make sure the drain hole in the subfloor or slab is
large enough (6” diameter recommended) and aligns
with the hole in the shower floor.
Make sure the subfloor under the shower floor is level
in both directions. The shower floor must be level when
installed. Improper installation will void the warranty.
The subfloor under the shower floor must be free of
dirt, film, waxes, or any other residues.
Disclaimer
The information contained in this Installation Manual
is given free of charge. It is based upon technical
data which we believe to be reliable and is intended
for use, by persons having knowledge of this
technical area, at their own discretion and risk. Swan
assumes no responsibility for results obtained or
damage incurred from the use of this material either
in whole or in part by the buyer.
This manual will give you basic step-by-step
instructions for the installation of the product that will
work in most types of installations. If you have an
installation application that is not covered in this
manual, before beginning the installation, please
call your local Swan distributor or contact the Swan
Corporation directly for additional information about
your application.
Follow all installation instructions. Failure to follow
these instructions could result in personal injuries,
water damage, or other damage to floors, pipes,
walls, or other portions of your building or home.
800-325-7008 7 The Swan Corporation – Swanstone
General Information