Installation Instructions

1
INSTALLATION GUIDELINES
SuperFast® Rigid Vinyl Flooring
RidgePlex, BayRock, Delaney, and Harbor Collections
Thank you for choosing our flooring. When properly installed and cared for, your new flooring will be
easy to maintain and will keep its great look for years. Please read all the instructions before you begin
the installation. Improper installation will void the warranty.
I. GENERAL PREPARATIONS
TOOLS REQUIRED: Spacers, rubber mallet, ruler, pencil, tape measure, utility knife, tapping block.
Prior to installation, inspect material in daylight for visible faults/damage, including defects or
discrepancies in color or shine; check the edges of the flooring for straightness and any damage.
No claims on surface defects will be accepted after installation.
It is preferable to lay boards perpendicular to the window, following the direction of the main source
of light. For the best result, make sure to always work from 3 to 4 cartons at a time, mixing the
planks during the installation.
Check if subfloor/site conditions comply with the specifications described in these instructions. If
you are not satisfied, do not install, and contact your supplier.
Flooring products can be damaged by rough handling before installation. Exercise care when
handling and transporting these products. Store, transport and handle the cartons in a manner to
prevent any damage. Store cartons flat, never on edge.
Flooring products can be heavy and bulky. Always use proper lifting techniques when handling
these products. Whenever possible, make use of material-handling equipment such as dollies or
material carts. Never lift more than you can safely handle; get assistance.
Calculate the room surface prior to installation and plan an extra 5-10% of flooring for cutting
waste.
The environment where the flooring is to be installed is critically important with regard to successful
installation and continued performance of the flooring products. The flooring is intended to be
installed in interior locations only. These interior locations must meet climatic and structural
requirements as well.
In most cases, this product does not need to be acclimated. However, if the boxes of flooring were
exposed over 2 hours to extreme temperatures under 50°F / 10°C or over 90°F / 32°C within the
12 hours before the installation, acclimation is required. In this case, keep the boards in room
temperature for at least 12 hours in unopened package before you start the installation. The room

Summary of content (8 pages)