Installation Guide

streamlinebath.com
support@streamlinebath.com (310) 935-0028
Construction Adhesive
a. Apply a generous amount of construction adhesive to the base of the
leveling feet or the selected support method. Carefully position the bathtub,
ensuring the leveling feet/selected support method rests on the floor. Make
any necessary adjustments or shimming. Confirm that the bathtub is level
on top and plumb near the drain. If it remains unlevel, use wooden shims
underneath to achieve a level position within the frame.
b. After finishing the installation, please take out the shims and administer
100% silicone caulk around the boundary of the bathtub, its rim, and the
completed deck. Remove any extra silicone sealant.
26