Owner's manual

WWW.STAINLESSWORKS.NET 800-878-3635 FAX: 440-543-9183
Installation
11. For installation using factory manifolds and cats: Install flanged lead pipes using
(4) 10 mm nuts removed earlier and install hangers.
12. For installation using Stainless Works Headers go directly to step 13.
13. Install X-pipe using (2) 3” clamps. Push all the way forward and level the X-
pipe.
14. Install tails using (2) 3” clamps and (2) 3” tail hangers. See pictures below.