Installation Guide

Opening Conduit Drill Guides
This section describes how to open the AC and DCdrill guides.
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
1.
Ensure that the Connection Unit and inverter ON/OFF switch are set to OFF.
2.
Loosen the screws on the front cover of the Connection Unit.
Figure 15: Opening the Connection Unit cover
3. Remove the Connection Unit cover.
4.
Open the required AC and DCconduit openings according to the conduits used in
the installation.
The conduit entries (usually covered)and the drill guides are located at the bottom
of the enclosure.
Figure 16: Connection Unit drill guides
Chapter 3: Installing the Primary and Secondary Unit(s) 35
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5