Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...
Reset Counters: Resets the accumulated energy counters that are sent to the
SolarEdge monitoring platform
Factory Reset: Performs a general reset to the default device settings.
FW Upgrade: Perform a software upgrade by using an SD card. Refer
to upgrading_an_inverter_using_micro_sd_card.pdf.
Diagnostics: Displays the Isolation Status and optimizers status
screens. Refer to http://www.solaredge.us/files/pdfs/application_note_
isolation_fault_troubleshooting.pdf.
AFCI: Enables or disables arc-fault self-test. Refer to
http://www.solaredge.com/sites/default/files/arc_fault_detection_
application_note_na.pdf .
Manual AFCI Test: Accessible from the LCDLight button menus only. Starts a self-
test for arc detection. Refer to http://www.solaredge.com/sites/default/files/arc_fault_
detection_application_note_na.pdf .
Standby Mode: Enables/disables the Standby Mode - for remote commissioning.
After you set the inverter to the Standby Mode, the batteries will charge until
reaching an SOE of 100% to prevent a critically low SOE. Only then will the inverter
enter the Standby Mode. Each battery charge may take approximately two hours.
Grid Protection: Available in specific countries. Enables viewing and setting grid
protection values.
Optimizer Conf.: Opens the Rapid Shutdown menu, to enable/disable PVRSS.