Board Replacement: Backs up and restores the system parameters, including
energy counters; Used during board replacement according to the instructions
supplied with replacement kits.
Information
From the Commissioning menu, select Information to view and set various system
settings, as described below.
CPU Version: The communication board firmware version
DSP 1/2 Version: The digital board firmware version
NOTE
Please have these numbers ready when you contact SolarEdge Support.
Serial Number - The inverter serial number as appears on the enclosure sticker
Hardware IDs: Displays the following HW serial numbers (if exist, and
connected to the inverter):
This inverter: the inverter's ID
Meter # : Energy meter ID (up to 3 meters can be connected)
ZB: ZigBee Plug-in MAC address
Cell: MEID (CDMA) or IMEI (GSM)
Error Log: Displays the last five errors, and enables resetting (clearing) the log.
Warning Log: Displays the last five warnings, and enables resetting (clearing)
the log.
Step 3: Verifying Proper Activation and
Commissioning
1. Select Information and verify that the correct firmware versions are installed on each
inverter.
2. Select Status and verify that inverter is operating and producing power (see also
Viewing System Status
on page 57).
3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
4. Verify that the green inverter LED๎ššis steadily lit.
Your SolarEdge power harvesting system is now operational.
-Three
Phase
System
Installation
Guide
MAN-01-00527-1.2
56 ๎šš๎ššStep 3: Verifying Proper Activation and Commissioning