SE43.2K Inverter Installation

Main Inverter Status
Status
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 138 of 141
Optimizers
Connected
Server Comm.
S_OK
(LAN)
Status
Production
Switch
OFF
CosPhi
1.00
Limit
No Limit
Country
USA2
Voltage
850 Vdc
Temp
156 F
Fan
OK
Switch Off. Production disabled
Commissioning
Inverter: The inverter serial number
Power: The AC output power
Voltage (Vac): The AC output voltage
Frequency: The AC output frequency
P_OK: xxx of yyy: There is a connection to the power optimizers and at least one
power optimizer is sending monitoring data. XXX is the number of power
optimizers for which telemetries have been received in the last two hours. YYY is
the number of paired power optimizers identified during the most recent pairing
process. If XXX and YYY are not equal, there may be a problem in one or more
power optimizers.
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp 59