Install Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Technical Specifications - Three Phase Inverters (North America)
10.
TerminatethefirstandlastSolarEdgedeviceinthechainbyswitchingaterminationDIP-switchinside
theinvertertoON(movetheleftswitchup).Theswitchislocatedonthecommunicationboardand
ismarkedSW7SW1.
Figure 36: RS485 termination switch
NOTE
Only the first and last SolarEdge devices in the chain should be terminated. The other inverters in
the chain should have the termination switch OFF (down position).
11. Ifnotusingsurgeprotection,connectthegroundingwiretothefirstinverterintheRS485chain;
makesurethegroundingwireisnotincontactwithotherwires.ForinverterswithaSafetySwitch,
connectthegroundingwiretothegroundingbus-barintheSafetySwitch.
To connect to the monitoring platform:
1. DesignateasingleinverterastheconnectionpointbetweentheRS485busandthemonitoring
platform.Thisinverterwillserveasthemasterinverter.
2. ConnectthemastertothemonitoringplatformviatheLANoption(refertoCreatinganEthernet
(LAN)Connectiononpage54)oranyoftheotheroptions.
To configure the RS485 bus:
Allinvertersareconfiguredbydefaultasslaves.Toconfigurethemaster:
1. VerifytheON/OFF/PswitchisOFF.
2. VerifythatACison.
3. UseSetApptoaccesstheCommissioningmenuscreenasdescribedinCommunicationonpage43.
4.
FromtheCommissioningmenutapCommunication.TheCommunicationscreenisdisplayed.
5.
Selectthefollowingtoconfiguretheconnection:
l ServerèLAN
l RS485-1èProtocolè SolarEdge Master
l RS485-1èSlave Detect
Thesystemstartsautomaticdetectionoftheslaveinvertersconnectedtothemasterinverter.The
invertershouldreportthecorrectnumberofslaves.Ifitdoesnot,verifytheconnectionsand
terminations.
6. TochecktheslaveIDsandlastcommunicationtime,selectRS485-1èSlave List.
7. Verifytheconnectionofthemastertothemonitoringplatform,asdescribedinthenextsection.
Verifying the Connection
Afterconnectingandconfiguringacommunicationoption,performthefollowingstepstocheckthat
theconnectiontothemonitoringserverhasbeensuccessfullyestablished.
Chapter 6: Setting Up Communication
-Three Phase System Installation Guide MAN-01-00527-1.1