Installation Guide
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Appendix E: Determining the Circuit Breaker Size
- Technical Specifications - Single Phase Inverters (North America)
- Technical Specifications - Three Phase Inverters (North America)
Chapter 5: Commissioning the Installation
This chapter describes how to activate the system, pair the poweroptimizers to the
inverter and verify the proper functioning of the system.
Step 1: Activating the System
1. Verify that the inverter ON/OFF switch is OFF.
2. Verify that the Safety Switch is in the OFF position.
3.
Remove the inverter cover: Open the inverter cover’s six Allen screws and carefully
pull the cover horizontally before lowering it.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the
inverter cover is removed.
RISQUE D’ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le
couvercle de l'onduleur est retiré.
4.
Activate the inverter:
a. Verify that the card S/N matches the inverter S/N.
b. Insert the card into the "CARD" slot on the communication board.
c. Turn ON the AC switch of the main circuit board.
d. LCD shows: Running Script...è Done!
Figure 25: Activation card
If LCDshows: Failed:
-Three Phase System Installation Guide MAN-01-00002-4.3
52 Chapter 5: Commissioning the Installation