P400 Installation
Table Of Contents
- SolarEdge Installation Guide - North America Version 4.0
- Disclaimers
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Technical Specifications
- Appendix C: Mechanical Specifications
- Appendix D: External Fan Maintenance and Replacement
- Appendix E: Replacing and Adding System Components
- Appendix F: Inverter Arc Detection and Interruption
Cellular Status
S e r v e r : C e l l < S _ O K >
S t a t u s : < O K > S i g : 5
< E r r o r m e s s a g e >
l Server:ThemethodofcommunicationtotheSolarEdgemonitoringportal.Should
displayCell.
l Status:DisplaysOKiftheinverterestablishedasuccessfulphysicalconnectiontothe
Cellularmodem.
l S_OK:ThelastcommunicationtotheSolarEdgemonitoringportalwassuccessful
(appearsiftheinverterisconnectedtotheportal).
l Sig:Thesignalstrength,receivedfromthecellularmodem.Avaluebetween0-5,(0=
nosignal,5=excellentsignal).
l Error messagepercommunicationconnectionstatusfailure
Communication Ports Status
D e v P r o t # #
R S 4 8 5 - 1 < S E > < S > < - - >
Z i g B e e < S E > < M P S > < - - >
l ##:Thetotalnumberofslavesdetectedonthespecificport
l Dev:Thetypeofdevicethatwasconfiguredtoaspecificport(basedontheport’s
functionality),asfollows:
o
SE:SolarEdgedevice(default)
o
DM:Revenuemeter
o
LGR:Non-SolarEdgelogger
l PROT:Theprotocoltypetowhichtheportisset:
o
ForaSolarEdgedevice:
n S:SolarEdgeslave
n M:SolarEdgemaster
n P2P:ZigBeepoint-to-point
n MPM:ZigBeemultipointmaster(fortheSolarEdgeZigBeehome
gateway)
n MPS:ZigBeemultipointslave(foraZigBeeroutermodule)
SolarEdge-Installation Guide MAN-01-00002-4.0
68
Cellular Status