2018 Installation Guide MODELS SK-60P/80P/120P/160P/210P/280P SAMS
INSTALLATION INSTRUCTIONS 2.1 Unpacking Note: Before unpacking the unit, verify that the machine model is correct and that there is no damage to the outer packaging. If the outer packaging is in good condition, proceed to unpack the unit by following these steps: Note: this machine is heavy! Use a mechanical hoist or the help of two people to lift if necessary. 1. Carefully remove all external wrappings and other protective coverings, including the white plastic coverings on the panels.
Sides Back Front 15.0 cm [5.90 in] 20.0 cm [7.87 in] 30.0 cm [11.81 in] • Installation site must be leveled. Adjustable feet at the bottom of the machine are provided to level the unit. • The installation site must be capable of supporting the weight of the ice machine and a full bin of ice. • The installation site may not be next to heat-generating equipment or in direct sunlight.
• Inlet Pipe Diameter must be larger than 9.5 mm [3/8 inch]. • Drain Pipe Diameter must be larger than 15.8mm [5/8 inch] and drop 3 cm per meter [3/8 inches per foot]. DRAIN PIPE INSTALLATION NOTE: To prevent drain water from flowing back into the ice machine and storage bin the following rules must also be complied with: 1.) No point in the drain pipe shall be higher than the drain outlet from the ice machine. 2.