Installation Guide

A - Open / Closed Sot (Page 5) B - Vented Sot (Page 6)
ON SITE STORAGE
Store o the ground well supported, on a at well-drained
surface. Store products under a roof or separate waterproof
covering. (See diagram 1a)
Additional support may be required to achieve a safe clearance
from the ground.
When the waterproof covering is removed, cut all unit banding.
• Keep sot clean and dry. Inspect prior to installation.
PREPARATION
General Information
• LP SmartSide strand substrate sot has achieved code recognition by APA in accordance with PR-N117 as Rated Sheathing/
Ceiling Deck. Product Report is available at www.lpcorp.com.
• LP’s application instructions describe the minimum requirements needed to assure LP SmartSide limited warranty coverage.
• Failure to follow the LP application instructions could result in reduced product service life and may lead to denial of
coverage under the LP SmartSide limited warranty.
1a
A
B
LP SmartSide Sot
Application Instructions
Vented and Non-Vented
Smooth Finish or Cedar Texture
1

Summary of content (7 pages)