Installation Guide
SMARTCORE™
Premium Engineered Vinyl Flooring
Installation Instructions
SMARTCORE™ INSTALLATION INSTRUCTIONS (V.1.1)
1
ATTENTION! READ BEFORE INSTALLING!
FOR BEST VISUAL REPRESENTATION OF YOUR FLOOR
This flooring replicates the look of a natural product which has natural variations in color, texture, and sheen/gloss. For best
visual effect, shuffle planks from several cartons and do not install similar planks next to one another.
SUBFLOOR PREPARATION
Subfloor should be dry and level to 3/16” per 10 ft. radius for best installation results.
SMARTCORE™ Premium Engineered Vinyl Flooring Installation Instructions
READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION. If the following instructions leave any
unanswered questions or if additional information is required, please call Natural Floors toll free at 800-404-2675 (706-733-6120).
FLOORING MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION
Responsibility for the suitability of Natural Floors flooring and accompanying products for each individual installation cannot
be assumed by Natural Floors, since Natural Floors has no control over the installer's proper application. Should an
individual plank be doubtful as to appearance or dimension the installer should not use this piece. Natural Floors will send
replacement in a timely fashion.
NOTE: Natural Floors SMARTCORE Premium Engineered Vinyl Floors may be installed with a direct glue-down method on
approved wooden (or) concrete substrates that are on, above, or below grade. Use only Natural Floors recommended flooring
adhesive. Please consult with adhesive manufacturer to determine if suitable for use with this material.
READ BEFORE INSTALLING:
While SMARTCORE is waterproof, it’s not a moisture barrier. It’s still a good idea to make sure your concrete is cured and a
covered with a minimum 6 mil polyfilm moisture barrier, and, when installing over a raised subfloor, that a moisture barrier is
installed in the crawl space. Moisture won’t damage SMARTCORE, but it can get in the walls and structure of the home. A
couple of extra dollars and a few extra minutes is a small investment for the added protection and peace of mind.
Use good common sense installation practices, and you’ll have a successful installation that results in a beautiful floor.
PRE-INSTALLATION JOBSITE REQUIREMENTS
NATURAL FLOORS cannot be held responsible for site conditions.
Carefully examine the flooring prior to installation for color, finish and quality. Ensure adequate lighting for proper inspection. If
flooring is not acceptable, contact your supplier immediately and arrange for replacement. NATURAL FLOORS cannot accept
responsibility for flooring installed with visible defects. Prior to installation of any flooring, the installer must ensure that the jobsite and
subfloor meet the requirements of these instructions. NATURAL FLOORS is not responsible for flooring failure resulting from
unsatisfactory jobsite and/or subfloor conditions.
Flooring should be one of the last items installed in any new construction or remodel project.
Crawl spaces must be a minimum of 18′′ (46 cm) from the ground to the underside of the joists. A ground cover of 6–20 mil black
polyethylene film is essential as a vapor barrier with joints lapped 6′′ (15 cm) and sealed with moisture resistant tape. The crawl space
should have perimeter venting equal to a minimum of 1.5% of the crawl space square footage. These vents should be properly located
to foster cross ventilation. Where necessary, local regulations prevail.
Room temperature and humidity of installation area should be consistent with normal, year-round living conditions for at least one week
before installation of flooring. Maintaining an optimum room temperature of 70
o
F and a humidity range of 30-50% is recommended.