Installation Guide

Double Pullout Waste Bins
Installation Instructions
Inspect all parts and read all instructions prior to beginning assembly and installation.
SP-BSC12-2-27-P
SP-BSC15-2-35-P
Place sliding base assembly on cabinet floor,
in desired position. Position front mounting
strap against the back edge of the cabinet
face frame. (If installing in a frameless cabinet,
measure 1/2" to 3/4" back from front of
cabinet opening, and align sliding base
assembly parallel to cabinet opening.) Close
door to make sure the assembly will not
hold cabinet door open. Also, check to see
if unit will clear the door opening when fully
extended. Once position is determined, fasten
in place using four mounting screws provided
and a Phillips head screwdriver.
OPTIONAL STEP: Mark placement of mounting
holes with a pencil, remove sliding base
assembly and drill pilot holes for fastening
screws. Place sliding base assembly back into
position and fasten with the provided screws.
IMPORTANT: The front and rear wire cages
are different. Install the rear cage first.
1
Tools Required
• Phillips Head Screwdriver
Drill with 1/16" (1.5mm) bit for
drilling pilot holes
• Pencil
Product Assemblies
Waste Bin (2)
Wire Cage (2)
Sliding Base Assembly (1)
Handle (1)
Cage Locking Clip (2)
Mounting Screws (4)
Parts Included
Rear
Front
Mounting
Straps
Sliding Members
1

Summary of content (4 pages)