Installation Sheet
2Vanity Installation Guide
1. Lift the vanity top from the front edge, bringing to a vertical
position, while keeping the back edge in the box.
2. Remove the vanity top from the box while maintaining its
vertical position. You can use the sink openings to hold
vanity top, but be sure to also the top from the bottom.
Always maintain the top in a vertical position while
carrying.
3. Carefully lift the vanity top onto the vanity, ensuring that the
top does not hit or bump anything. Have someone assist
you if you cannot easily handle weight of the top.
4. Slowly and carefully place the top on the vanity. Check that
the top is level. If not, insert shims and adjust as
necessary.
5. Raise the vanity top and place a dot of adhesive silicone
sealant on the corners of the vanity.
6. Position the vanity top back onto the vanity and press
rmly into place. Wipe away any excess sealant with a
damp cloth.
7. If your vanity top has a separate side and/or back-splash,
place a bead of adhesive silicone sealant on the back and
press rmly into place. Fill the gaps between the wall and
splash, and vanity top and splash with silicone sealant.
Wipe away any excess
sealant with a damp cloth.
8. Let the silicone dry for 24 hours before using your vanity.
VANITY TOP INSTALLATION
Important: If the vanity top weighs 50 lbs. or more, have someone assist you.
Silicone Adhesive