Installation Sheet
LATTIMORE SHOWER SET INSTALLATION
Step 1: Valve Installation
3. Route, assemble, and connect all in-wall piping to and
from the shower valve. Make connections appropriately
depending upon the type of pipe that is being used. For
copper pipe, soldering will be required and should be
completed by a licensed plumber. Apply plumber’s tape
to any threaded connections if applicable. Install any
wood blocking that is necessary to support the piping
and valve.
Notes:
• Female fittings will need to be installed where the
hand shower’s cradle and the shower arm will mount.
• The piping for the overhead shower should be
connected to the bottom outlet of the rough-in valve.
Piping for the hand held shower should connect to the
top.
1. To prepare for installation, wood blocking should be
installed between the two studs where the valve will
mount. Use the guide printed on the valve’s protective
sleeve as a reference when installing the wood block-
ing.
Important: Take into consideration the thickness of
the finished wall materials, such as tile, when calculating
measurements. If the finished wall extends beyond the
maximum guideline marked, the trim pieces will not
install.
2. Secure the valve to the prepared wood blocking
using the provided hardware. Ensure that the hot
outlet is pointing to the left, and the cold outlet is
pointing to the right. Use a level to ensure that the
valve is installed straight.
Tip: Leave the protective sleeves on the valve stems
until your finished wall is complete, and you are ready
to install the trim pieces.
2Lattimore Shower Set Installation Instructions
HOT
COLD
OUT
OUT
handheld
shower
overhead
shower