Installation Instructions

DOOR TRIM AND HARDWARE
PARTS REQUIRED:
2" (5,1 cm)
x5
x7
x4
44
2
Flush
ZB
36"
(91,4 cm)
3/4" (1,9 cm)
Center over door.
Ensure nails are pounded into wall
frame, behind the panel.
door trim and hardware.
Install hasp door and latch on door trim. Bottom edge of hasp is
36" (91,4 cm) up from bottom edge of door trim. Measure and mark locations and
install with 3/4" screws as shown (Fig A).
14
3/4" (1,9 cm) Screw x7
Fig. A
13
Center ZB
FINISH
15
x1
19/32 x 2-1/2 x 55" (1,5 x 6,4 x 139,7 cm)
ZB