Figure 5.4
E. Vent Diagrams
Top Vent - Horizontal Termination
Venting with 1 elbow
H
1
V
1
V Minimum
H
1
Maximum
SL-550TR-E SL-750TR-E SL-950TR-E
90 Elbow 2 ft. 610 mm 2 ft. 610 mm 1 ft. 305 mm
1/2 ft. 152 mm 2 ft. 610 mm 2 ft. 610 mm 2 ft. 610 mm
1-1/2 ft. 457 mm 3 ft. 914 mm 3 ft. 914 mm 3 ft. 914 mm
2-1/2 ft. 762 mm 5 ft. 1.5 m 5 ft. 1.5 m 5 ft. 1.5 m
3-1/2 ft. 1.1 m 7 ft. 2.1 m 7 ft. 2.1 m 7 ft. 2.1 m
4-1/2 ft. 1.4 m 14 ft. 4.3 m 14 ft. 4.3 m 14 ft. 4.3 m
H MAX. =14 ft. (4.3 m)
V + H MAX. = 40 ft. (12.2 m)
Fire Risk. Explosion Risk.
Do NOT pack insulation or other combustibles between ceiling fi restops.
• ALWAYS maintain specifi ed clearances around venting and fi restop systems.
• Install wall shield and ceiling fi restops as specifi ed.
Failure to keep insulation or other material away from vent pipe may cause fi re.
WARNING
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when using
fl ex vent except when using the
simple up and out installation
(see Figure 5.3).
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-SS
termination caps on top vented fi replaces, a one
foot minimum vertical vent section is required before
installing fi rst elbow.
WARNING
• When using DVP-TB1 termination cap on top vented fi replaces,
a three foot minimum vertical vent section is required before
installing fi rst elbow.