Operation Manual

63
E
When installing, removing or moving the monitor, ensure that this is carried out by at least 4 people. (PN-L652B: at least 2
people.)
Be sure to use a wall-mount bracket designed or designated for mounting the monitor.
This monitor is designed to be installed on a concrete wall or pillar. Reinforced work might be necessary for some materials
such as plaster / thin plastic board / wood before starting installation.
This monitor and bracket must be installed on a wall which can endure at least 4 times or more the weight of the monitor.
Install by the most suitable method for the material and the structure.
To attach a VESA-compliant mounting bracket, use M8 screws that are 3/8 inch (10 mm) to 1/2 inch (12 mm) longer than the
thickness of the mounting bracket.
Screws (M8)
Mounting bracket
Monitor mounting
3/8 - 1/2 inch (10-12 mm)
Do not use an impact driver.
When moving the monitor, be sure to hold the handles or the parts marked by
below. Do not grasp the screen. This may
cause product damage, failure, or injury.
If you need to temporarily place the monitor on a table or other surface during installation, spread a thick soft cloth on the
table to prevent damage to the screen and table.
After mounting, please carefully ensure the monitor is secure, and not able to come loose from the wall or mount.
Do not use any screw holes other than those for mounting brackets, located on the rear of the monitor, for installation.
Mounting Precautions
(For SHARP dealers and service engineers)
n
Attaching STB mount
Attach the STB mount when installing an optional controller.
1
2
STB mount
1. Remove the screws from this monitor.
2. Attach the STB mount with the STB mount screws
(M3x6) (supplied) (x2).
TIPS
Store the removed screws.
After removing the STB mount, put back the removed
screws.