Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Wiring the Conext XW+ Inverter/Charger and Conext XW+ Power Distribution Panel
3–34 975-0239-01-01 Rev G
This manual is for use by qualified personnel only
code on the information panel. Correct the reported fault and clear the fault by
acknowledging it. If the DC voltage is low, then the battery bank needs to be
charged externally. Charge the battery bank and restart the functional test.
AC Voltage Check
To perform an AC voltage check:
1. With the inverter on (green kW LED is on and steady), verify the AC voltage at
AC Loads block terminal L1-Load to N-Load.
2. Verify that neutral is bonded to ground in the system by measuring the hot
and neutral voltages relative to ground. Neutral-to-ground should equal zero
(0) volts.
3. After confirming the correct AC voltage, turn on your AC output breaker and
place a load on the inverter (plug in a light or other load to an outlet the
inverter is powering).
4. Confirm that the AC load that was just turned on is working properly.
Confirming Battery Charger Operation
To confirm battery charger operation:
1. Apply AC from grid or generator. LEDs will blink while the power source is
qualified.
2. Check LEDs (AC1 or AC2) on the front panel. One of them must be ON for
the unit to charge.
3. Check the amp (A) LED. If the A LED is ON, the unit is charging and the
battery current is displayed on the inverter information panel.
Note: This test requires the use of a voltmeter.
Figure 3-20 Checking AC Voltage