User Manual

Table Of Contents
Samsung CDMA BSS: Indoor BTS Installation Manual
37
BSS Version 4, Document V4D0001 release 0.5, Indoor BTS Installation
Manual, release 2.0
Connecting the GPS cables
The GPS cables are routed using a combination of cable ladders,
cable pass-throughs, and cable trays. Cable ties are applied
wherever appropriate.
The routing of the overhead cables is illustrated in the following
figure:
The procedure for connecting these cables is as follows:
1 Ground the EMP bulkhead with 7.42 mm (2 AWG 1C) cable to the
Main Grounding Board (MGB).
2 Lay the GPS jumper cable between the bulkhead and the Indoor
BTS rack.
3 Attach N-type male connectors to both ends of the GPS jumper
cable.