Installation Guide

Figure 4A Figure 4B Figure 4C
STEP 4
Locate the connector kit mounting holes on the opposite connecting side of the parcel locker unit (see Step 3-Figure 3A for hole identification). Align the
holes on the 4C connector bar with the holes located on the parcel locker unit (see figures 4A-4C). Attach connector bar to the parcel locker unit with
the provided #8 x 1/2” pan head self tapping machine screws (see figures 4D-4E). The installation should now look like figure 4F - below.
Page 5 of 7
Side View
Unit shown
with master
door open
Figure 4D – Top side of unit facing 4C Connector Bar Figure 4E – Bottom side of unit facing 4C Connector Bar
Figure 4F – 4C Connector Bar is now attached to parcel locker unit
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes
no product assembly or installation liability. Copyright © 2015 Salsbury Industries. All rights reserved. (Rev. 11, 02/10/2017)
SALSBURY INDUSTRIES
1010 East 62nd Street, Los Angeles, CA 90001-1598
Phone: 800-624-5269 Int’l Phone: 323-846-6700 Fax: 800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering@mailboxes.com