Manual

SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Ph: 1-800-624-5269
Int’l Ph: 323-846-6700
Fx: 1-800-624-5299
Int’l Fx: 323-846-6800
www.mailboxes.com
engineering@mailboxes.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2011 Salsbury Industries. All rights reserved. (P/N 370135, Rev. 10, 6/21/11) Page 2 of 2
Step 4
Install the Arrow lock cover by sliding the tab located on the Arrow
lock cover over the mounting box slot. Secure it with the two (2)
special McGard security screws. Installation is complete.
To Check Locking Mechanism
Lock the tenant lock and remove the key. Lock the Arrow lock and
remove the key. Insert the tenant lock key into the tenant lock.
Unlock the tenant lock. The tenant lock key should now be trapped
in the tenant lock. The tenant lock key cannot be removed until the
Arrow lock is unlocked.