Installation Guide

2
ZA386 FLOOR LEGS - ASSEMBLY INSTRUCTIONS
6
1 3 / 1 6"
1 3 / 1 6"
6
WARNING
DO NOT
OVER TIGHTEN
Installation requirements: 2 x 1/2” NPT male stub outs at 5 29/32” center
Please note: if installing with an Italian Bath exposed tub filler you must install a set of adaptors C5574EXT
Apply Teflon tape to the male connections.
Hand tighten, then turn with a strap wrench
½ to ¾ turn to make a seal.
WARNING: Do not over tighten. Over tightening could cause the brass to crack.
Test for leaks before installing floor escutcheons.
Please note that the threaded connection only ensures hydraulic water tightness, mechanical fixing
of floor legs is ensured by the whole part assembly of components listed as 1-2-3-4-5 in picture .
Slide on base escutcheons (1) and the cut bushings (2).
Mark the screw holes for drilling.
Drill a hole using a 13/32” drill and install floor anchors (3).
Slide the base escutcheons (1) to the floor, align with holes and tighten Allen screws (4) using a 5/32” Allen wrench.
Insert the cut bushings (2) into the base escutcheons (1) and slide on the threaded ring (5). Then tighten using a 1 7/16” wrench.
5 2 9 / 3 2"
G.1/2"NP T
G.1/2"NP T
min.19/32" - max.3/4"
5 2 9 / 3 2"
G.1/2"NP T
G.1/2"NP T
min.19/32" - max.3/4"
Install elbow unions (6) to pillar legs, using a 1 3/16” wrench, ensuring that all washers create a seal.
Install tub faucet to elbow unions using a 1 3/16” wrench, ensuring that all washers create a seal.
CISAL
28010 Alzo di Pella - Italia
Tel. +39 0322 918111 - Fax +39 0322 969518
cisal@cisal.it
- www.cisal.it
ROHL LLC
3 PARKER - IRVINE, CA92618
www.rohlhome.com
1
2 3
5
1
2
3
4
5
4
1
2
5
3
4
Ø 1 3 / 3 2 "
1 7 / 1 6"
5 / 3 2 "
PARTS
ENSURING
MECHANICAL
FIXING
4
T
EL: 800-777-9762 FAX: 714-557-8635
ZA386 FLOOR LEGS - ASSEMBLY INSTRUCTIONS
6
1 3 / 1 6"
1 3 / 1 6"
6
WARNING
DO NOT
OVER TIGHTEN
Installation requirements: 2 x 1/2” NPT male stub outs at 5 29/32” center
Please note: if installing with an Italian Bath exposed tub filler you must install a set of adaptors C5574EXT
Apply Teflon tape to the male connections.
Hand tighten, then turn with a strap wrench
½ to ¾ turn to make a seal.
WARNING: Do not over tighten. Over tightening could cause the brass to crack.
Test for leaks before installing floor escutcheons.
Please note that the threaded connection only ensures hydraulic water tightness, mechanical fixing
of floor legs is ensured by the whole part assembly of components listed as 1-2-3-4-5 in picture .
Slide on base escutcheons (1) and the cut bushings (2).
Mark the screw holes for drilling.
Drill a hole using a 13/32” drill and install floor anchors (3).
Slide the base escutcheons (1) to the floor, align with holes and tighten Allen screws (4) using a 5/32” Allen wrench.
Insert the cut bushings (2) into the base escutcheons (1) and slide on the threaded ring (5). Then tighten using a 1 7/16” wrench.
5 2 9 / 3 2"
G.1/2"NP T
G.1/2"NP T
min.19/32" - max.3/4"
5 2 9 / 3 2"
G.1/2"NP T
G.1/2"NP T
min.19/32" - max.3/4"
Install elbow unions (6) to pillar legs, using a 1 3/16” wrench, ensuring that all washers create a seal.
Install tub faucet to elbow unions using a 1 3/16” wrench, ensuring that all washers create a seal.
CISAL
28010 Alzo di Pella - Italia
Tel. +39 0322 918111 - Fax +39 0322 969518
cisal@cisal.it
- www.cisal.it
ROHL LLC
3 PARKER - IRVINE, CA92618
www.rohlhome.com
1
2 3
5
1
2
3
4
5
4
1
2
5
3
4
Ø 1 3 / 3 2 "
1 7 / 1 6"
5 / 3 2 "
PARTS
ENSURING
MECHANICAL
FIXING
4
T
EL: 800-777-9762 FAX: 714-557-8635
ZA386 FLOOR LEGS - ASSEMBLY INSTRUCTIONS
6
1 3 / 1 6"
1 3 / 1 6"
6
WARNING
DO NOT
OVER TIGHTEN
Installation requirements: 2 x 1/2” NPT male stub outs at 5 29/32” center
Please note: if installing with an Italian Bath exposed tub filler you must install a set of adaptors C5574EXT
Apply Teflon tape to the male connections.
Hand tighten, then turn with a strap wrench
½ to ¾ turn to make a seal.
WARNING: Do not over tighten. Over tightening could cause the brass to crack.
Test for leaks before installing floor escutcheons.
Please note that the threaded connection only ensures hydraulic water tightness, mechanical fixing
of floor legs is ensured by the whole part assembly of components listed as 1-2-3-4-5 in picture .
Slide on base escutcheons (1) and the cut bushings (2).
Mark the screw holes for drilling.
Drill a hole using a 13/32” drill and install floor anchors (3).
Slide the base escutcheons (1) to the floor, align with holes and tighten Allen screws (4) using a 5/32” Allen wrench.
Insert the cut bushings (2) into the base escutcheons (1) and slide on the threaded ring (5). Then tighten using a 1 7/16” wrench.
5 2 9 / 3 2"
G.1/2"NP T
G.1/2"NP T
min.19/32" - max.3/4"
5 2 9 / 3 2"
G.1/2"NP T
G.1/2"NP T
min.19/32" - max.3/4"
Install elbow unions (6) to pillar legs, using a 1 3/16” wrench, ensuring that all washers create a seal.
Install tub faucet to elbow unions using a 1 3/16” wrench, ensuring that all washers create a seal.
CISAL
28010 Alzo di Pella - Italia
Tel. +39 0322 918111 - Fax +39 0322 969518
cisal@cisal.it
- www.cisal.it
ROHL LLC
3 PARKER - IRVINE, CA92618
www.rohlhome.com
1
2 3
5
1
2
3
4
5
4
1
2
5
3
4
Ø 1 3 / 3 2 "
1 7 / 1 6"
5 / 3 2 "
PARTS
ENSURING
MECHANICAL
FIXING
4
T
EL: 800-777-9762 FAX: 714-557-8635

Summary of content (4 pages)