Instructions / Assembly
FRONT
BACK
S-2A
S-2B 65
65
1.3
IMPORTANT: When assembling base, make sure the proles are straight and ush against each other. Secure
proles together, and ensure corners are square. The diagonal measurements on inside corners should be equal.
Secure corners to desired foundation until assembly is completed. We recommend using a two by four platform.
8 of 44
WWW.RSIWW.COM
Set Screw Placement Code
Set screws used in steps 1.4A and 1.4B
Set screws used in steps 2 through 10
Set screws used in step 11
Separate proles to install set screws into inside and outside bolt tracks. Some of the set
screws will be secured in this step. Most are secured in later steps. They are dicult to install
after the base is assembled. Pay careful aention to ensure you have the correct number of set
screws in the correct bolt track in each prole. The proles have dierent amounts of screws on
the inside and outside bolt tracks. The chart and illustration below show the set screw placement.
The squares represent screws that are used in steps 1.4A and 1.4B, the circles represent
screws used in steps 2 through 10 and the crosses represent screws used in step 11.
NOTE: Instructions identify twelve set screws necessary for securing to ground in step 11.