Installation Instructions

Recommended Products:
Staple Tab, Reflective/Bubble/Bubble/Reflective - Roll: ST24100 (24”x 100’), ST48100 (48”x 100’)
Bottom of the Trusses
Open Interior
R-10* Heat Flow Down (and a Radiant Barrier) | R-3.7* Heat Flow Up
Please Note: In addition to the stated R-value, this application also provides a Radiant Barrier.
As a result, a 96% reduction of the radiant energy that ordinarily would be transmitted to the interior of the building is blocked.
Installation Instructions:
Pre-installation inspection - Check the roof area for clutter, water sprinklers, conduit and lights.
Sprinkler systems are especially important. All water pipes must be below the Reflectix
®
Reflective/Bubble/Bubble/Reflective, Staple Tab product to prevent the possibility of freezing in the
winter.
Nail 1”x 2” furring strips on the bottom of and perpendicular to the trusses on 22” centers. (Note:
When truss spacing is 24” it is recommended to install the Reflectix
®
24” or 48” product directly to
the bottom cord of the truss.)
1. Reflectix
®
Insulation
2. Exterior Roof Panel
3. Purlin
4. Truss
5. 1”x 2” (Nominal)
Furring Strip
Tools Required:
Safety Glasses
Tape Measure
Utility Knife
Staple Gun
PF Bldg / Roof / Retro / Bottom of Trusses
Reflectix
®
Installation Instructions
2
1
5
3
4