Ra peat attach to a sing the next Dn stalled right, distance respond screw in all the Bring 1+2% shelves upright for in ing up the the boreholes and studs for
Locate the elevation drawing that corresponds with the wall you will da next Accounting for the attenuate of the bridge piece, mark whore your first side is going to beg Starting at the furthest from first wall, stat process again 110 4 by i the fixed s
Locate the first fixed shelf volley be installing our drawer above. Skipping the first set of holes above the shell, line up the second line boring with holes in drawer shied. Starting with back hole. screw In the two screws o fasten the drawer slides 1o the upright. Repast on the other side Push the sides all the way in 50 they nullify closed. Line up of the drawer the uprights even pressure sill the wav. extend the drawer it again 1o ensure it you i correctly fully drawer.
Establish at which hag want to install your adj shelves Facing with the pointed install your 4 lock-in p same height by into the holes Place the shelf with facing down over top shelf inns and push your adj