Installation Instructions

T H E H E I G H T O F Q U A L I T Y
TOOLS & MATERIALS NEEDED
• Hacksaw or metal cutting saw
• Drill
• Drill bits: 1/8", 1/4", 5/32", 7/32"
• 3/8" socket or wrench
• Philips screwdriver
• Measuring tape
• Non-corrosive exterior silicone caulking
All fasteners are included with each component.
Lag bolt
Universal
Connector
(UC) bolt
Flat head screw
Sheet metal screw
Self-drilling screw
Installation Guide
TM
Patents pending © Peak Innovations Inc., 2004
Peak Products America Inc. (U.S.A.)
Peak Products Manufacturing Inc. (Canada)
Peak Products International Inc.
(Outside U.S.A. and Canada)
The Peak Group of Companies:
P.O. Box 33866, Vancouver BC, Canada V6J 4L6
Peak products and the materials associated
therewith are protected by patents, designs,
copyright and/or trademarks. All trademarks
are used under license and are owned by
Peak Innovations Inc.
NOTE: Universal Connectors (UCs) can be used for either
Horizontal Angle or Stair Applications, mount backing plate
accordingly.
IMPORTANT INFORMATION
PICKET RAILING INSTALLATION
WARNING
No member of the Peak Group of Companies* shall be liable
f o r a n y l o s s o r d a m a g e r e s u l t i n g f r o m t h e i m p r o p e r
installation or use of these products. If any member of the
Peak Group of Companies becomes liable for any loss or
damage, the aggregate liability of the Peak company shall be
limited to the retail purchase price of that product.
Before using these products, ensure areas to
be drilled are free from utilities, services and hazards.
B u i l d i n g c o d e s m a y v a r y. A l w a y s c o m p l y w i t h a l l
applicable building codes.
Backing
Plate
Horizontal Angle
Application
Stair
Application
Wall
mount
brackets
2
3/8
"
Post
mount
brackets
42
1/8"
42
1/8
"
2
3/8"
When securing posts with lag bolts, ensure bolts penetrate
a mi n i mu m o f 1 1 /2 " o f s o li d w o o d . To p r e v e n t w o o d
splitting and rot, drill 5/32" pilot holes and coat lag bolt
threads with non-corrosive exterior silicone caulking.
Ensure posts are plumb.
NOTE: Railings can also be attached to a wall or post
using brackets as shown below.
1
Measure and mark the position of all posts and space
equally. Lag bolt end post in place. Temporarily position
the second post - do NOT bolt it yet! Cut hand and
base rails to fit between posts. Install base rail support and all
but the last four spacers in each rail.
HELPFUL TIP:
Soap may be used to ease spacer installation.
Spacers
Base rail support
2
post. Insert picket into base rail and swing top into handrail as
shown below. Repeat to complete section.
Insert rails into first post and use second post as temporary
support - do NOT secure rails yet. Slide all spacers toward
temporary post. Slide first spacer in each rail against first
These products are designed for most residential applications.
42
1/8
"
2
3/8
"
CDN-0904
* The Peak Group of Companies
P e a k P r o d u c t s M a n u f a c t u r i n g I n c .
(Canada)
Peak Products America Inc. (USA)
Peak Products International Inc. (Outside
Canada & USA)

Summary of content (3 pages)