User's Manual

MC-Series ©2008 RadioFrame Networks, Inc. E-11
Proprietary and Confidential Information
MC-Series Standard Capacity system
998-1019-01 Rev X1
a. If the warning “Test Signal Timing Out of Lock” appears, cycle power to
the R2660 and set it up again to generate an in-bound 1x6 test signal at
the desired frequency and signal level into the Rx port. It may take a few
minutes for the R2660 test signal to stabilize.
b. If the only BER measurements reported are 50%, NO DATA, or both,
verify that all procedure steps have been completed. If no problems are
found, cycle power to the R2660 and set it up again to generate an in-
bound 1x6 test signal at the desired frequency and signal level into the
Rx port. It may take a few minutes for the R2660 test signal to stabilize.
If there's still no change after cycling power to the R2660, select the
Stop Test button.
12. When the BER test is complete, lock the RadioBlade transceiver that was
under test.
13. Display the RadioBlade Control page, and lock the RadioBlade transceiver
by selecting its lock icon so that it is closed (locked).
a. Refresh the page every 30 seconds until the
State of the RadioBlade
transceiver has changed to ‘2’.
14. Repeat Steps 1 through 12 for each RadioBlade transceiver to be tested on
this Rx port.
15. Move the test leads to the next sector at TOR when all desired blades in the
current sector have been tested and repeat the procedure.
E.8 Equipment Disconnection
Note: Disconnect equipment after completing the BER
testing.
1. Disconnect the R2660 from the Rx port under test.
2. Display the DRBS Status page, and verify that all RadioBlade transceiver status
icons are green.
3. Disconnect the network cable from port 8 of the ABIC CRIC.
E.9 BER Test Notes Master
You can use this page to make copies of (Table E.1) for use as a handy organizer
and permanent record of the BER tests.