Installation Sheet

1of2
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Assembly Instruction Sheet #IS-KGF1506BN
For Style KGF1506BN
Pleasegoto forproductcleaningtips.Gotothe selection.
(1)A19MediumBaseBulb100WMaximum
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired: Flathead screwdriver,Phillips screwdriver,pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
A
Crossbar Assembly
x1
Thank you forpurchasing a Quoizelproduct.
Need assistance withparts or assembly?Call Quoizel customerservice at 1-800-645-3184
or visit us on-line at www.quoizel.com
Shade
x1
2018 QuoizelInc.
ReleasedDate:2018-01-10
D
Socket
Assembly
x1
E
Ceiling
Canopy
x1
STEP 1 -
Socket Assembl
Install Ceiling Canopy, Rods and
y together
A. Determine the Rods (B/C) to be
assembled to the Socket Assembly (E)
according to your hanging height.
B. Pass the supply wires and ground wire
through the chosen rods (B/C) and the
Ceiling Canopy (D). Thread the Socket
Assembly (E), the chosen Rods (B/C) and
the Ceiling Canopy (D) together. Hand
tighten until snug.
Suggested rods for Ceiling height :
8’ ceiling : use (2) 12” rods
9’ ceiling : use (2) 6” rods and (2) 12” rods
STEP 2 - Installing the Crossbar Assembly
A. Pass the supply wires from outlet box through the Crossbar
Assembly (A). Attach the Crossbar Assembly (A) to the Outlet Box
with the head of the Green Ground Screw facing you. Secure the
Crossbar Assembly (A) with Outlet Box Screws (not included).
Tighten until snug.
Supply Wires with
Ground Wire
Outlet Box Screws
(not included)
Outlet Box
A
Figure 2
STEP 3 Test Fitting Ceiling Canopy to Crossbar Assembly-
A.
eiling Canopy to the
ceiling
Remove mounting balls from the Crossbar Assembly (A). Fit the
C (D) Crossbar Assembly (A) and secure with
mounting balls. Note: The should be snug
against the and the mounting balls. If
Ceiling Canopy (D)
not, adjust the length
of the nipple on the Crossbar Assembly (A) by unscrewing the
preassembled hex nut and lock washer and then screwing the
mounting screws in or out of the crossbar until the correct length is
achieved. Once the Ceiling Canopy (D) is secure, remove the
mounting ball and Ceiling Canopy (D) and proceed to Step 4.
Mounting Screw
Hex Nut and
Lock Washer
Mounting Ball
A
Figure 3
D
Figure 1
F
Socket
Collar Tool
x1
G
B
6” Rod
x2
C
12” Rod
x2
B
B
D
Supply Wires
and Ground Wire
C
E
C

Summary of content (2 pages)