Installation Guide
1of2
Assembly Instruction Sheet #IS-CRG1910MB
For Style CRG1910MB
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
2016 QuoizelInc.
Package Contents
ReleasedDate:2016-09-13
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184
or visit us on-line at www.quoizel.com
Hardware Contents
AA
BB
CC
DD
EE
FF
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling Canopy
x1
HH
Quick Link
x2
II
GG
Fixture Chain
x1
STEP 1 Attach Glass Panels and Cage to Socket Assembly
(See view A)
-
A. Insert Glass Panels (B) into the slot in the bottom edge of the Cage
(E) properly. Place Clips (F) on the top edge of the Cage (E) to hold
Glass Panels (B), secure by threading Flat Head Screws (G) onto
Cage (E). Tighten until sung.
B. Attach fixture hood of Socket Assembly (A) onto top edge of Cage (E)
A
C
Figure 1
A
Socket
Assembly
x1
B
Glass Panel
x4
C
Lock
Screw
x4
D
Tab
x4
E
Cage
x1
D
E
Tab
F
Clip
x2
G
Flat Head
Screw
x4
B
Slot
F
G
E
View A
.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Pleasegoto forproductcleaningtips.Gotothe selection.
(1)A21MediumBasebulb150WMaximumor
(1)MediumBaseVintagebulbisrecommendedbutnotsupplied.
20-30minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired: Flathead screwdriver,Phillips screwdriver,pliers, wire cutters, wire strippers, electrical tape, safety glasses.
(Step 1 Continued)
and align holes on the fixture hood to mounting holes on Tabs at the
top edge of the Cage (E). Attach Tabs (D) onto fixture hood and
secure with Lock Screws (C). Tighten until snug with screwdrivers.
Figure 2
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA
STEP 2 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included) Tighten until snug..
STEP 3 Install Canopy Chain Loop and Nipple-
* Pliers is required for this step.
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end of
the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD). Place
another Lock Washer (BB) over the Nipple (DD) and then thread the
Nipple (DD) into the Crossbar (AA) until the Nipple (DD) is about
Step B
Step A
CC
BB
EE
II
FF
AA
BB
CC
DD
Figure 3
0.375” above the
Crossbar (AA).
C. Remove the Canopy
Lock Ring (FF) from the
Canopy Chain Loop
(EE). Place the Ceiling
Canopy (II) over the
Canopy Chain Loop (EE)
against the ceiling to determine
the correct position of the Nipple
(DD). Thread the Canopy Lock
Ring onto the Canopy Chain
Loop (EE). Adjust the Nipple
(DD) to allow the Ceiling Canopy
(II) to rest against the ceiling
when held in place by the
Canopy Lock Ring (FF).
D. Remove the Canopy Lock Ring
(FF) and the Ceiling Canopy (II).
Tighten the Hex Nut (CC)
against the Crossbar (AA) to
secure in place.