Datasheet

Basics
Installation
Install configurable control systems PNOZmulti 2
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: info@pilz.com
2015-11
25
Install configurable control systems PNOZmulti 2
Control cabinet installation
} The unit should be installed in a control cabinet with a protection type of at least IP54.
} Install the system vertically on to a horizontal mounting rail. The venting slots must face
upward and downward. Other mounting positions could damage the safety system.
} Use the locking elements on the rear of the unit to attach it to a mounting rail.
} In environments exposed to heavy vibration, the unit should be secured using a fixing
element (e.g. retaining bracket or end angle).
} Open the locking slide before lifting the unit from the mounting rail.
} To comply with EMC requirements, the mounting rail must have a low impedance con-
nection to the control cabinet housing.