Preparing for operation
Function test during commissioning
Using the chip card
Make sure that you do not bend the chip card as you insert it into the chip card slot.
Commissioning the PNOZmulti safety system
Procedure:
} Wire the inputs and outputs on the base unit in accordance with the circuit diagram.
} Connect the supply voltage:
Supply voltage for the control system:
Terminal A1: + 24VDC
Terminal A2: 0 V
Supply voltage for the semiconductor outputs:
24 V terminal: + 24VDC
0V terminal: 0 V
Please note: The supply voltage for the semiconductor outputs must always be present,
even if you are not using the semiconductor outputs.
Load project from chip card
Procedure:
} Insert the chip card containing the current project into the card slot on the base unit.
} Switch on the supply voltage. The LC display shows the project name, CRC sum and
the date the project was created. Please check this information.
} Load the project by pressing the rotary knob. For the project to be downloaded, the
rotary knob must be held down for between 3 and 8 seconds. Once the project has
been successfully downloaded, the status of the inputs and outputs will be shown on
the display.