Installation Guide

TRADITIONAL WALL MOUNT TUB FAUCET
Notes:
1. Please ensure all local plumbing and building codes are observed when
installing these faucets.
2. Mounting location depends on tub design and location. Be sure to identify tub height
when determining faucet location.
3. There must be a minimum of 2" gap between top of tub rim and bottom of the faucet
spout to comply with plumbing codes. (See fig. 4)
4. Water supply lines must be roughed in on 8” centers.
Step 1
Attach spout by loosening setscrew in the back of the
faucet body, and inserting the spout inside the body
until flush. Tighten the setscrew.
Step 3 Rough-in #23 T-WLBO flush to finished
wall. Hot/Cold supplies should be roughed in on 8”
centers and 1/2” pipe (supplied by installer) should
extend 3/8” to 1/2” beyond the finished wall.
Step 4 Screw decorative flange #22 included with
T-WLBO onto rough portion #23.
Step 5 Attach faucet to wall by screwing union nuts
onto the T-WLBO wall elbows with #10 washer.
Step
2
Screw #11 handle hub onto hot/cold cartridges
#9 and #17. Disassemble handle and install
onto cartridge by securing with screw included.
8
Reassemble handle.
Setscrew
Spout
Finished Wall
3/8"-1/2"
T-FB1
Union Nut
T-WLBO (23)
Pipe Nipple
Decorative Flange (22)
Washer (10)
T-HCRS
T-HPLV
11
White Porcelain
11
T-HLVR
9
11
17
Finished Wall
Rough-in T-WLBO
Flush to finished wall.
Pipe nipple should
extend 3/8" - 1/2" beyond
finished wall.
Nipple
Decorative
Flange
Pipe
1/2
- 14