User manual
Section 1, Overview
• Ability for technician to easily access and service the product,
especially fuel, plumbing, and electrical systems.
• After installation, ability to purge water and fuel lines and
inspect/test entire system using the ITR-supplied Inspection
Check Sheet.
1.5 Equipment, Tools and Skills
As the user and/or installer, you must be qualified and authorized to
do the installation, which requires mechanical aptitude and electrical
knowledge. Make sure you comply with existing RVIA or ABYC
industry practices, using the highest and most recent standards and
codes. Good workmanship is essential. Please refer back to
Section 1 – Overview, sub-Section 1.2, Protect Your Warranty.
You will need the following equipment and tools to install the
heating system (not supplied). This list does not include optional
equipment and accessories:
• Standard tools normally available in a well-equipped shop.
• Approved fasteners for mounting the heater unit.
• Steel (or stainless steel) 2” ID exhaust system piping, maximum
12’ with no bends. (See Section 3 – Installing the Exhaust
System, for details when bend are present.).
• Exhaust collar.
• ITR-muffler with straight-through design.
• 1/4” supply fuel line, approved rubber or copper.
• #10 sheet metal screws or wood screws to mount fan units
inside the occupied areas.
• Heater hose (to connect optional Distribution Module hose
fittings to interior fans).
• Domestic water hose and/or tubing to connect the Distribution
Module hose fittings to the domestic water system.
• Overflow tank to connect to the Oasis™ Heating Module with
clear plastic 3/8” hose; tank must be heavy-duty plastic, with a
1-6 The Oasis™ Heating Module