User's Manual

Test Equipment Set-up – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP 3-81
PRELIMINARY
CDMA2000 1X/IS–95A/B–capable Test Equipment
Connections
Table 3-28 depicts the Interconnection Requirements for currently
available Test Equipment supporting both CDMA 2000 1X and
IS–95A/B that meets Motorola Standards and is supported by the LMF.
Table 3-28: CDMA2000 1X/IS–95A/B Test Equipment Interconnection
COMMUNICATIONS SYSTEM ANALYZER ADDITIONAL TEST EQUIPMENT
SIGNAL
Agilent
8935
(Option 200
or R2K)
Agilent
E7495A
Advan
test
R3267
Agilent
E4406A
Signal
Generator
Advant-
est
R3562
Signal
Genera-
tor
Power
Meter
GPIB
Inter-
face LMF
30 dB
Directional
Coupler and
20dB Pad*
BTS
EVEN SECOND
SYNCHRONIZATION
EXT
TRIG IN
EXT
TRIG
TRIGGER
IN
19.6608 MHZ
CLOCK
MOD TIME
BASE IN
EXT REF
IN
CONTROL
IEEE 488 BUS
IEEE
488
GPIB HP–IB GPIB
SERIAL
PORT
HP–IB
TX TEST
CABLES
RF
IN/OUT
RF IN TX1–6
RF INPUT
50 OHM
30 DB COUPLER
AND 20 DB PAD
RX TEST
CABLES
RF OUT
50 OHM
RF OUT 50
OHM
RX1–6
RF OUT
ONLY
SYNC
MONI
TOR
FREQ
MONITOR
PATTERN
TRIG IN
GPIB
RF OUTPUT
50 OHM
RF OUTPUT
50 OHM
10 MHZ IN
10 MHZ OUT
(SWITCHED)
10 MHZ IN
10 MHZ
OUT
10 MHZ
SERIAL
I/O
SERIAL
I/O
SIGNAL SOURCE
CONTROLLED
SERIAL I/O
EVEN
SECOND
SYNC IN
EXT REF
IN
HP–IB
RF IN/OUT
DUPLEX
OUT *
SYNTHE
REF IN
* WHEN USED ALONE, THE AGILENT 8935 WITH OPTION 200 OR R2K SUPPORTS IS–95A/B RX TESTING BUT NOT CDMA2000 1X RX TESTING.
EVEN
SECOND
SYNC IN
PORT 1
RF OUT
PORT 2
RF IN
3