RFDS Setup and Calibration – continued
Jan 2002
3-107
SC4812ET BTS Optimization/ATP — CDMA LMF
Program TSU NAM
The NAM must be programmed before it can receive and process test
calls, or be used for any type of RFDS test.
Prerequisites
MGLI is INS_ACT (bright green).
SUA is powered up and has a code load.
Follow the procedure in Table 3-53 to program the TSU NAM.
Table 3-53: Program NAM Procedure
Step Action
1 In the LMF, select the RFDS tab.
2 Select the SUA by clicking on it.
3 Click on TSU in the BTS menu bar, and select Program TSU NAM from the pull–down menu.
– A NAM programming window will appear.
4 Enter the appropriate information in the boxes (see Table 3-47 and Table 3-48) .
5 Click on the OK button to display the status report.
6 Click on the OK button to close the status report window.