User Manual

Bay Level Offset Calibration continued
SC4812ET BTS Optimization/ATP CDMA LMF
Jan 2002
3-84
TX Path Calibration
The TX Path Calibration assures correct site installation, cabling, and the
first order functionality of all installed equipment. The proper function
of each RF path is verified during calibration. The external test
equipment is used to validate/calibrate the TX paths of the BTS.
Before installing any test equipment directly to any TX
OUT connector you must first verify that there are no
CDMA channels keyed. Have the OMCR place the sector
assigned to the LPA under test OOS. Failure to do so can
result in serious personal injury and/or equipment damage.
WARNING
Always wear a conductive, high impedance wrist strap
while handling any circuit card/module. If this is not done,
there is a high probability that the card/module could be
damaged by ESD.
CAUTION
At new site installations, to facilitate the complete test of
each CCP shelf (if the shelf is not already fully populated
with BBX boards), move BBX boards from shelves
currently not under test and install them into the empty
BBX slots of the shelf currently being tested to insure that
all BBX TX paths are tested.
This procedure can be bypassed on operational sites
that are due for periodic optimization.
Prior to testing, view the CDF file to verify the
correct BBX slots are equipped. Edit the file as
required to include BBX slots not currently equipped
(per Systems Engineering documentation).
IMPORTANT
*
3