Caution : You must read this before you proceed Ottoman 1 OF 5
Label Description QTY A Ottoman 1 B Wooden Leg 4 Description QTY Washer Ring 7 Label ① Picture Picture Before Beginning Assembly: 2 OF 5
Overview Ottoman (A) Wood leg (B) FRONT FACING This Ottoman has multiple parts and may require up to 30minutes to assemble. To give you an overview of the ottoman parts, the above picture is to help you put the various parts into perspective. Please read through the instructions below to familiarise yourself with the parts and steps before assembly. Step 1 Open up the carton box and take the Ottoman out and place onto a clean soft surface. Then open up the Storage Ottoman.
Step 2 Ottoman (A) Washer Ring (①) Wooden Leg (B) Install the first leg(B) into the bottom of the Storage Ottoman(A) by placing 1 (ONE) piece of Washer Ring on the threaded stem. The use of Washer Rings (①) improves tightness and security of leg after assembly. Tighten by turning the leg clockwise. Repeat the same step to install the three remaining legs. Note : The use of Washer Rings are OPTIONAL and is especially useful to help alleviate slight wobbleness .
OF 5