Installation Instructions

Read these installation guidelines completely and thoroughly before
beginning installation.
Construction Requirements
• KuraStone™-StackedStone and KuraStone™-LedgeStone pieces can be
installed on braced wood or steel stud (18 GA or heavier) construction
spaced at 16” to 24” o.c.
•It is required that plywood sheathing or APA rated 7/16” or thicker oriented
strand board (OSB) be used to ensure fastener holding power.
•WRB is required when installing KuraStone™. Use a dark or black fluid-
applied WRB over sheathing or use a code-approved WRB covered with a
layer of 15-lb. black felt as defined by the 2006 IRC. Refer to local building
codes. Nichiha is not liable for water infiltration.
•All openings must have appropriate flashing (such as water-proofing tape)
to prevent moisture penetration. Follow manufacturer’s guidelines and all
local building codes.
Please consult with your local dealer or Nichiha directly when using
KuraStone™ on large projects, such as buildings taller than 45’ or greater than
three stories. Special reinforcements may be required.
Product Inspection
• Inspect all products thoroughly prior to installation. Do not install any
product which may have been damaged in shipment or displays damage to
the primer or finish coat.
Should you have a question about your order, contact your local dealer or
Nichiha Customer Service toll-free at 1.866.424.4421.
1
Plywood/OSB
Sheathing
Water Proong
Barrier (Black)
Starter
Corner Pieces
KuraStone
TM
Clip
KuraStone
TM
Installation Guide
StackedStone, LedgeStone and Sill-Chiseled

Summary of content (10 pages)