Installation Guide

GNG-G27-004
WWee rreeccoommmmeenndd IInnssttaallllaattiioonn ooff tthhiiss pprroodduucctt bbyy aa PPrrooffeessssiioonnaall PPlluummbbiinngg CCoonnttrraaccttoorr
NNoottee::
The use of petroleum based plumber’s putty on our products will nullify the warranty.
We recommend the use of clear silicone sealing materials.
All trim must be installed on finished wall surface.
Valve Trim Installation (Reference Figure 1)
Prior to proceeding, it is recommended to turn off water supply to valve.
Measuring and cutting stem length:
Note: For STEM (7) to be fully seated into the cartridge, ALL-THREAD (9) and NUT (10) must be tight-
ly secured against PLATE (11).
Indicate on ALL-THREAD (9) a measured distance of 1-3/4” from finished wall surface. Using a hack-
saw, cut ALL-THREAD (9) and STEM (7) at this location. Trim an additional 1/2” of ALL-THREAD (9)
back from end of STEM (7). See Figure 1A.
Coverplate:
Place COVERPLATE (6) on STEM (7).
Handle:
Secure HANDLE (12) by first engaging the STEM (7) and then threading ESCUTCHEON (13) onto ALL-
THREAD (9).
6
7
9
11
12
13
10
1-3/4”
FFiigguurree 11
Finished Wall
1-562 Valve
sold separately
1/2”
FFiigguurree 11AA