Instructions / Assembly
Table Of Contents
- IM-HKC.01A-01 REV 1.1_Home Cabinets Installation Guide
- Unpacking
- Product Inspection
- Home Cabinets and Accessories
- Tools Needed
- Hardware
- Room Preparation
- Installation Layout Options
- Installation Overview
- Removal and Installation of Doors
- Removal and Installation of Drawers
- Installation of Drawer Front Panels
- Installation of Drawer Front Panels
- Adjusting the Wood Shelves
- Installation of Glass Shelves on Wall Cabinets with Glass Doors
- Installation of Feet for Base Cabinets
- Corner Layout Installation
- Wall Rail Installation for Wall Cabinets
- Wall Cabinets Installation
- Installing the Linear layout
- Installing the Island layout
- Installing the U shaped layout
- Additional Accessories offered by NewAge
- SPARE PARTS - BASE CABINET with DOORS
- SPARE PARTS - BLIND CORNER
- SPARE PARTS - 3 DRAWER
- SPARE PARTS - SPLIT DRAWER and DOORS
- SPARE PARTS - PANTRY
- SPARE PARTS - SINK CABINET
- SPARE PARTS - STANDARD WALL CABINETS
- SPARE PARTS - CORNER WALL CABINET
- DOOR AND DRAWER REFERENCE TABLE
- Manufacturer One Year Limited Warranty
5
Unpacking
Product Inspection
• Begin by placing the package on a covered at surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
• Verify all the contents in the box and gather the required tools. See “Tools Needed” in the page 7.
• Check to see all parts are received as per the order
placed.
• Contact NewAge Products at 1-877-306-8930; for
any missing parts.
• Inspect the products for any damages before
starting the installation.
• Go through the installation instructions carefully
before starting the installation.