ASSEMBLY GUIDE Heartwood Trellis VA68899 VER 1.
GETTING STARTED First off, allow us to say thank you for the investment you have made in our fine wood trellis. This wood trellis is designed to be assembled and installed ideally by two people with basic carpentry knowledge and tools. Do not attempt alone, especially during the installation stage. When assembling components, place on a non-abrasive surface (ie: shipping box) to avoid scratching. We recommend a 15’ x 15’ area for unobstructed assembling.
IN THIS GUIDE MATERIALS OVERVIEW 4 MATERIALS BREAKDOWN 5 ATTACHING VERTICLE SUPPORTS ONTO POSTS 6 SCREW SUPPORT BEAMS HALF WAY ONTO POSTS 7 SCREW TOP RAIL FULLY INTO PLACE 8 SLIDE ALL HORIZONTAL SPINDLES UP VERTICLE SUPPORTS 9 SCREW BOTTOM RAIL FULLY INTO PLACE 10 ATTACH THREE VERTICLE SPINDLES TO THE TOP AND BOTTOM RAILS 11 ALIGN HOLES ON HORIZONTAL SPINDLES WITH VERTICLE SPINDLES AND SCREW INTO PLACE 12 INSTALLING MOUNTING POSTS INTO GROUND (A) 13 INSTALLING MOUNTING POSTS INTO GROUND
MATERIALS OVERVIEW 1 6 5 2 3 4 1. 12035 - Post (x2) 3 3/4” x 3 3/4” x 81 1/2” (9.50cm x 9.50cm x 207.01cm) 2. 12036 - Verticle Support (x2) 3/4” x 2 1/4” x 56 1/2” (1.90cm x 5.70cm x 143.50cm) 3. 12037 - Verticle Spindle (x3) 3/4” x 1 1/2” x 56 1/2” (1.90cm x 3.80cm x 143.50cm) 4. 12040 - Horizontal Spindle (x4) 3/4” x 1 1/2” x 52 1/4” (1.90cm x 3.81cm x 132.62cm) 5. 12041 -Top And Bottom Support (x2) 3/4” x 1 1/2” x 53” (1.90cm x 3.81cm x 134.62cm) 6. 12038- Beam (x2) 3/4” x 5 1/2” x 78” (1.
MATERIALS BREAK DOWN 12 1 80021 - MOUNTING POST (X2) 12035 - POST (X2) 2 12036 - VERTICLE SUPPORT (X2) 13 3 80022 - POUND CAP(X2) 12037 VERTICLE SPINDLE (X3) 14 4 12040 HORIZONTAL SPINDLE (X4) 5 12041 TOP AND BOTTOM SUPPORT (X2) ALLEN KEY (X2) 6 12038 - BEAM (X2) 7 15 9 20058 - JOINT CONNECTOR BOLT AND NUT (X18) 1” (3CM) 20057 - BOLT 6” (15CM) (X2) FLAT WASHER (X4) NUT (X2) 8 10 20063 - SCREW B 1 3/4” (4.5CM) (X4) 11 20037 - SCREW A 1 1/4” (3.
Step 1 ATTACHING VERTICLE SUPPORTS TO CENTRE OF POSTS When installing the verticle supports, make sure the front of each verticle support is facing each other! 1 1/4” (3.18CM) - X12 10 1/4 (26cm) 6 VER 1.
Step 2 SCREW SUPPORT BEAMS HALF WAY ONTO POST (X2) (X4) 6” (15CM) (X2) VER 1.
Step 3 SCREW TOP RAIL FULLY INTO PLACE 1 3/4” (4.5CM) (X2) 5 8 VER 1.
Step 4 SLIDE ALL HORIZONTAL SPINDLES UP VERTICLE SUPPORTS Your spindles will be loose, dont worry. They will be screwed in place in a later step! 4 12040 (X4) VER 1.
Step 5 SCREW BOTTOM RAIL FULLY INTO PLACE 1 3/4” (4.5CM) (X2) 5 10 VER 1.
Step 6 ATTACH THREE VERTICLE SPINDLES TO THE TOP AND BOTTOM RAILS 1” (3CM) X6 3 12037 (X3) VER 1.
Step 7 ALIGN HOLES ON HORIZONTAL SPINDLES WITH VERTICLE SPINDLES You may stand the trellis up for this step 1” (3CM) X12 12 VER 1.
Step 8A INSTALLING MOUNTING POSTS INTO GROUND With your trellis fully assembled and laying flat on the ground. Put each of your mounting posts at the end of each trellis post, positioned in the middle. This is crucial that your installing your trellis on flat ground and both mounting posts are equally in the middle of each post. BOTTOM OF TRELLIS POST TRELLIS POST OPENING MOUNTING POST GROUND VER 1.
Step 8B INSTALLING MOUNTING POSTS INTO GROUND When in position with your pound caps on the posts, hammer each post 18” (45.72cm) into the ground. Remove your pound caps. POUND CAP MOUNTING POST 18” (45.72 CM) 18” (45.72 CM) 18” (45.72 CM) 18” (45.72 CM) MOUNTING POST GROUND 18” (45.72 CM) 14 VER 1.
Step 7 GUIDE TRELLIS ONTO MOUNTING POSTS Make sure to have a helper for this step VER 1.
We’re here for you. If you have any questions at all, don’t hesitate to contact us. NORTH AMERICA TOLL FREE 1-800-282-9346 UNITED KINGDOM (44) 2038 687160 Visit our website to chat with a support technician. WWW.NEWENGLANDARBORS.COM WWW.NEWENGLANDARBORS.CO.UK 16 VER 1.